The next subcontractors to complete their tasks are the plumber, electrician and heating contractors.  It is important to have a team that works together to make everything fit and compliment each of the three systems.  RHD Plumbing of Stoughton began roughing much of their system before the slab was poured.    The next phase was to complete the work inside the house.    Pharo Heating is the heating contractor.  This home uses two furnaces, so they had to work carefully with the other two contractors to make sure everything would fit.  Ever Ready Electric is in charge of the electrical system.  Things went well and in about a week the home was ready for the next phase.  All three contractors did an excellent job, and went out of their way to make sure the jobsite was always clean and safe.